OUR PATENTED STEEL PIER
Ram Jack's Unique Pier Features
Driving Head
The Ram Jack® driving head delivers rapid power to long sections of piling for a faster installation and a stronger pier.
Hydraulic Rams
Have over 70,000 lbs. of driving force available to deliver to the Ram Jack® pier column.
Bracket
The Ram Jack® bracket has been tested in excess of 100,000 lbs. of force.
Guide Sleeve
The extended guide sleeve loads the piling vertically and rifles the piling as it advances through unknown strata.
Steel Pier
The Ram Jack® Steel Pier material has been tested and specifically selected for it's unusually high quality to resist bending and buckling. Tensile tests average 150,000 lbs.
Pier Connector
The 12 inch pier connector is composed of a smaller diameter section of the same high quality tubing and is crimped into one end of each pier section. The connector is a slip joint into the next pier system.
Expansion Ring
This ring expands the soil away from the piling to reduce friction during the driving process for maximum penetration through unstable soil.
Soil Plug
Creates a solid base for the lead pier section to bear on firm strata.
We Never Let You Down!
Call us at 1-888-934-9669 for more information
|